Description
15kVA/15kW
Designed for server room and data centre applications, the XRT 3-Phase Series adopts double-conversion topology to provide seamless Pure Sine Wave output.
The XRT 3-Phase series also adopts ECO Mode to save on energy costs, Smart Battery Management (SBM) to extend battery lifespan, and multifunction LCD readout to display precise information. The power management software allows users to easily control and monitor the UPS system.
Unity Power Factor: kW=kVA
Phase: 3:3/3:1/1:1
Input Voltage (Vac): 80-280 (L-N)/138-485 (L-L)
Frequency (Hz): 40-70
Power Factor: ≥0.99
THDi at full Linear load: <3%
Dual Main Input: Yes
Batteries: 16~40*9AH/12V
Output Capacity (kW): 15
AC/AC Efficiency (Max.): 96%
Output Voltage (Vac): 220/230/240±1% (L-N) 380/400/415±1%(L-L)
Frequency (Hz): 50/60±0.1 (battery mode)
THDv: ≤2% (linear load), ≤4% (non-linear load)
Crest Factor: 3:1
Overload Capability: 110% load for 60 mins, 130% load for 10 mins, 155% load for 1 min, above 155% load for 200ms
EPO: Remote and Local
Cold Start: Yes
Communication Management: RS485+EPO+Dry contact (1 input,5 output)(SNMP are optional in slot)
UPS Runtime: Extended Runtime
UPS Topology: Online Double Conversion
Form Factor: Tower Only
Dimensions: (W×D×H)(mm) 250×755×880
Weight: With Battery -98kg (20×9AH), Without Battery 50kg, With TX 143kg
Noise (dB): <55
Working Temperature (°C): -5~40
Relative Humidity: 0 ~ 95%, no condensation
Altitude (m): 2000, no derate
Part Number: XRT-3PH-15KVA
Key Features:
• Unity Power Factor kW=kVA
• Anti Corrosion Resistant Coating On PCB Boards
• Dust Filter Protection
• Includes Industry Leading 10-Year Design Life Batteries, Refer to Brochure.
• Includes Network Card Pre-Installed
• Includes Dry Contact Card Pre-Installed
• Includes Battery Temperature Sensor
• Complimentary Upgrade To 4:3 Inch Touch Screen
• 3 Phase In/3 Phase Out (3:3) Standard
• 3:1 or 1:1 conversion complimentary if required (Please ask your sales representative)
• Generator Compatible
• UPS Parallel Expansion Kit Available (Please ask your sales representative)
• Parallel of 2 Units Can Share Common Battery Bank
Industry First Comprehensive Start-Up Package:
• Commissioning In-house or On-site within 100KM of CBD (Outside incurs travel cost)
• 2-Year Australian Warranty
• 2-Year Australian Bi-Yearly Service Package within 100KM ofCBD (Outside incurs travel cost)
• 1-Year Australian Labour Warranty within 100KM of CBD (Outside incurs travel cost)