A conventional data centre build needs a slab, a building fabric, a mechanical contractor, an electrical contractor and a commissioning window measured in quarters. Every one of those is a dependency on your site, in your weather, with your access constraints.
Prefabrication moves that work into a factory. Racks, cooling, UPS, batteries, distribution, fire suppression, access control and monitoring are installed and proven under load before the unit ships, so what arrives is a finished facility rather than a construction project.
Three forms cover the range: the XRT-AI range for AI and HPC clusters, the XRT-CDC containerised range for edge, mining, defence and multi-megawatt sites, and CRX4-LC liquid cooling for the densities air cannot carry. The right one is decided by rack density, site conditions and how much you expect to grow.